Categories | Spare parts of paper machine |
---|---|
Place of Origin: | Shandong,China |
Brand Name: | Hengbon |
Certification: | ISO |
Model Number: | high speed toilet paper making machine,Heavy Cleaner,paper machinery,stock preparation,Paper edge cu |
MOQ: | 1 set |
Price: | reel machine,Heavy Cleaner,paper machinery,stock preparation |
Packaging Details: | Standard exporting packing or as client's requirement |
Delivery Time: | 7-30 days |
Payment Terms: | TT or L/C at sight |
Supply Ability: | 1000sets |
Company Info. |
Hengbon Industrial Co., Ltd. |
View Contact Details |
Product List |
1.Application:
This type of chain plate conveyor is mainly used in the paper making industry to transport a variety materials,such as bulk transport, pulp plate and waste paper. Can do level transportation or less than 25 degrees gradient transport, The conveying speed can be adjustable. Mainly used for waste paper feeding to pulper.
2.Features:
1. Reasonable structure
2. Large Conveying capacity
3. Small Power consumption
4. Less wear
5. Reliable work
6. Ideal waste paper transportation equipmet
3.Main specification:
Type | ||||||||
Width of chain plate(mm) | 1200 | 1400 | 1600 | 1800 | 2000 | 2200 | 2400 | 2600 |
Capacity (m3/h) | 60-220 | 80-255 | 95-300 | 110-345 | 140-390 | 160-430 | 200-500 | 240-600 |
Materials | waste paper or paper pulp plate | |||||||
Max.Limit of Material (mm) | 1000 | 1200 | 1600 | 1400 | 1800 | 2000 | 2200 | 2400 |
Motor power(Kw) | 5.5 | 7.5 | 11 | 5 | 18.5 | 22-30 | 30-45 | 37-55 |
4. Basic structure
a. Head drive : electromotor , reducer ,drive equipment, Active sprocket device
b.Tail drive: tail shaft , Sprocket driven
c. Tension device
d.chain plate parts
e.frames
5. Installation and commissioning
By our enegeer or professional Installation company
6. Usage and maintenance
1. Strive to even feeding material when operation, feeding maximum weight should be controlled in the specified scope
2. Stop or start when Stop or start is not suitable
3. Moderation of Traction chain should be reasonable , In the operation should be frequently check and adjust it
4. Reducer 7must add the lubricating oil after 7-14 days operation , later according to situation , three to six months once.
5. ll lubricating points should be timely injection lubrican
After-sales Service
2.After-sales Service
About Us
Customer Services
Sell On Us
Friendly Links: www.everychina.com
Français| Русский язык| Español| Português| 日本語
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们