Sign In | Join Free | My chinaqualitylighting.com
chinaqualitylighting.com
Products
Search by Category
Wholesale Marketplace
Home > Welding & Soldering Supplies >

Remote Control Well Testing Choke Manifold Drilling API SpEC 16C

Categories Choke Kill Manifold
Brand Name: Hebei Pantu
Model Number: YG140
Certification: API 16C
Place of Origin: China
MOQ: 1 set
Price: USD 50000-100000 per set
Payment Terms: T/T
Supply Ability: 5 sets per 3 months
Delivery Time: 7 work days
Packaging Details: Iron Case
Name: Choke Manifold Drilling
Model: YG140
Bore size: 4 1/16"
Pressure: 20000psi
Application: Drilling
Standard: API SpEC 16C
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Remote Control Well Testing Choke Manifold Drilling API SpEC 16C

4 1/16 Inch 20000psi Choke Manifold Drilling API SpEC 16C


Choke Manifold Drilling Working principle


When the pressure rises in well, fluid in the well can be released in the utilization of the choke valve opening/closing in choke manifold to control casing pressure, which can directly blow out through the gate valve as the casing pressure is quite high.


Choke Manifold Drilling Parameter


TypeWorking pressureMain bore diaBy-pass dia.Remarks
(psi)On.)(In.)
YG140200004 1/16" 3 1/16" 2 9/16" 2 1/16"3 1/16" 2 1/16" 2 9/16"Different types of combinations can be provided according to requirements
YG105150004 1/16" 3 1/16" 2 9/16" 2 1/16"3 1/16" 2 9/16" 2 1/16"
YG70100004 1/16" 3 1/16" 2 9/16" 2 1/16"4 1/16" 3 1/16" 2 9/16" 2 1/16"
YG3550004 1/16" 3 1/8" 2 9/16" 2 1/16"4 1/16" 3 1/8" 2 9/16" 2 1/16"
YG2130004 1/16" 3 1/8" 2 9/16" 2 1/16"4 1/16" 3 1/8" 2 9/16" 2 1/16"

Configuration


The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges, and other components.


Operating Instructions


(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the operator can reach it easily. The pressure test must be performed before installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120-degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low-temperature conditions.


Buy Remote Control Well Testing Choke Manifold Drilling API SpEC 16C at wholesale prices
Send your message to this supplier
 
*From:
*To: Hebei E-valves Petroleum Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0