Sign In | Join Free | My chinaqualitylighting.com
chinaqualitylighting.com
Products
Search by Category
Wholesale Marketplace
Home > Measuring & Gauging Tools >

Pre Engineered Steel Building Structure with Custom Dimensions

Categories Pre Engineered Building
Brand Name: YDX
Model Number: YDX-KF5
Certification: CE ISO SGS
Place of Origin: CHINA,QINGDAO
MOQ: 10-10000 square meters
Price: $35.00-$63.00
Payment Terms: T/T
Supply Ability: 10000 tons/month
Delivery Time: 20-30 works days
Packaging Details: Exported standard packing
Name: Pre Engineered Metal Building Structure
Dimensions: Customers' Requirement
Frame: Steel Structure, Truss
Roof And Wall: Steel Sheet Or Insulated Sandwich Panel
Installation: Fast With Installing Drawing Guide
Visit: Acceptable
Color: Client's Request
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Pre Engineered Steel Building Structure with Custom Dimensions

Pre-engineered Metal Structural Prefab Storage Warehouse Hangar With Free Atchitectural Support

Highlight: Metal Structural Storage Warehouse ,Pre-engineered Storage Warehouse

Processing Steps of Prefabricated Steel Structure Buildings:


Planning and Design

Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.

On-Site Assembly

After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks.

We own more than 20 engineers who have abundant experience for various types buildings. Before design, all requirements will be collected from clients. The design will obey the requirements and pass the calculation check by the architectural soft, such as CAD, PKPM, 3D3S etc.

For the initial planning, we will design the construction blueprint after confirming the client’s requirements details. With the check and feedback from the clients, we will make the revise if possible.

After the confirm, we will make further steel structure detailed drawing to prepare the production. This will still be offered to the clients to confirm. Double check will guarantee the building with correct details.

Container House Prefab
ItemPrefab Homes
Steel StructurePrefab steel structure
Wall Panel0.326/0.376/0.426/0.476mm THC steel sheet
50/75/100mm THC EPS / rock wool / glass wool / pu sandwich panel
Wall ColorWhite grey and more(Depending on quantity)
Roof0.326/0.376/0.426/0.476mm THC steel sheet
50mm THC EPS / rock wool / glass wool / pu sandwich panel
Door0.326/0.376/0.426/0.476mm THC steel sheet
50mm THC EPS / rock wool / glass wool /pu sandwich panel with lock
WindowAluminum PVC sliding door with security bar
FloorMGO / cement fiber floor board
ElectricityPre-wired with lighting and circuit distributor installed

Steel Structure Building Installation steps:

1.Foundation construction (pre-embedded anchor bolts)

Installing detailed drawing will be offered in advance.

2. Column installation

One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location.

3.Beam installation

After completing the installation of adjacent two steel column, then main beam begin to install.

4.Installing roof & wall purlin

The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.

5.Fixing wall and roof sheet

To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet.

6.Fixing the cover

To install the cover on the corner, eave, window and door opening.

7.Install windows and doors.

Buy Pre Engineered Steel Building Structure with Custom Dimensions at wholesale prices
Send your message to this supplier
 
*From:
*To: Qingdao Yidongxiang Steel Structure Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0