Sign In | Join Free | My chinaqualitylighting.com |
|
All method statement for building construction wholesalers & method statement for building construction manufacturers come from members. We doesn't provide method statement for building construction products or service, please contact them directly and verify their companies info carefully.
Total 1075 products from method statement for building construction Manufactures & Suppliers |
|
![]() |
Brand Name:A.S.P Model Number:ASP-26 Place of Origin:Sichuan, China Building Phase Change Energy Storage PCM Igniting The Light Of Hope For Energy Conservation And Environmental Protection Product Introduction: As a new type of building material, 26 ℃ phase change energy storage materials have excellent temperature regulation capabilities, significant energy-saving and environmental benefits, convenient and flexible construction methods... |
Sichuan Aishipaier New Material Technology Co., Ltd.
Sichuan |
![]() |
Categories:Unitized Curtain Wall Country/Region:china ... to designated floor positions. Workers only need to adjust and fix the connectors to complete the installation. Compared to traditional curtain wall installation methods, the |
Shiny-Control Technology Develop (Beijing) Co., Ltd.
Beijing |
![]() |
Brand Name:LANGE Place of Origin:HeBei China Prefab/Prefabricated Easily Built Simple Structure Steel Construction 1) All indoor plumbing electrical pipelines are concealed in the wall and between floors, with flexible layout and convenient modification. 2) Houses can be relocated and all materials... |
Dongguang Lange Equipped Housing Co., Ltd.
Hebei |
![]() |
Brand Name:LANGE Place of Origin:HeBei China Metal Construction Prefab Steel Structure Farm, Industrial Factory Workshop /Warehouse H Beam Steel Frame House 1) Structural design, detail design, computer simulation installation, factory manufacturing, site installation, etc. are carried out ... |
Dongguang Lange Equipped Housing Co., Ltd.
Hebei |
![]() |
Brand Name:LANGE Place of Origin:HeBei China Design Prefab Steel Structural Frame Steel Construction 1) Structural design, detail design, computer simulation installation, factory manufacturing, site installation, etc. are carried out synchronously with a small time difference. 2) The dry ... |
Dongguang Lange Equipped Housing Co., Ltd.
Hebei |
![]() |
Brand Name:X MESH Model Number:X MESH-Rib Lath 005 Place of Origin:Hebei P.R. China. ...Construction Sites 0.3mm Galvanized Stainless Steel Expanded Metal Lath For Building Materials Fields High Ribbed Formwork Introduction: High ribbed formwork (formwork), also called concreting mold mesh or metal rib lath, high rib lath, is a particularly designed product which is fabricated from hot-dipped galvanized steel sheets by expanding and roll-forming methods... |
Anping Yuanfengrun Mesh Products Co., Ltd.
Hebei |
![]() |
Brand Name:YDX Model Number:YDX-84 Place of Origin:CHINA,QINGDAO ...ough methods such as welding and bolting. They are widely used in industrial plants, high-rise buildings, bridges, towers, and more. The steel used typically includes sections, plates, and pipes, which offer high strength, good plasticity, and toughness. |
Qingdao Yidongxiang Steel Structure Co., Ltd.
Shandong |
![]() |
Brand Name:QZ RIDGE Model Number:RS-076 Place of Origin:FUJIAN,CHINA ...highly popular in the construction industry due to its shorter construction timelines and lower overall costs compared to traditional civil construction methods. The fabrication of steel structures is a complex process that demands specialized expertise, |
Quanzhou Ridge Steel Structure Co.,Ltd.
Fujian |
![]() |
Brand Name:YiFang Model Number:YF-PWA1010 Place of Origin:Hebei, China (Mainland) ... drywall anchor Rongfeng Insulation Pins and fasteners provide quick easy and effective methods of installing a varity of insulation materials to a multitude of building construction materials. Mould NO. Dia(mm) Material Screw dia(mm) CN5091D 10*33 nylon 3-3... |
Langfang Yifang Plastic Co.,Ltd
Hebei |
![]() |
Brand Name:TW-TECHWAY Place of Origin:China ... elevator, which provides a communication line between the building floors and building hoist operator,and it could also be used as general communication method in other industries. Because the radio frequency does not need to apply from local authority, |
GUANGZHOU TECHWAY MACHINERY CORPORATION
|
![]() |
Brand Name:GST Model Number:Steel Structure Warehouse Place of Origin:China Qingdao ...Frame Construction Building About This Steel Structure Warehouse Building --Roof design Double slope single ridge The roof slope is 10%, and the outer gutter + φ110UPVC forms a roof drainage system, which can cope with the rainy season Roof method: 0.4MM ... |
QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD
|
![]() |
Brand Name:DAXIAN Model Number:DX9030 Place of Origin:China IMO2010 Ftp Code Part 5 Lateral Flame Spread On Building Products In Vertical Configuration ISO5658-2 Product Introduction: Fire testing according to ISO 5658-2 evaluates a material's ability to withstand a fire spreading along its surface. The method... |
DONGGUAN DAXIAN INSTRUMENT EQUIPMENT CO.,LTD
Guangdong |
![]() |
Brand Name:DAXIAN Model Number:DX8299 Place of Origin:China BS476-7 Building Material Flame Surface Spread Classification Tester Introduction: BS 476-7 is mainly used for the determination of the extension of the flame which on the exposed surface of the wall and ceiling. The test method is through the gradual ... |
DONGGUAN DAXIAN INSTRUMENT EQUIPMENT CO.,LTD
Guangdong |
![]() |
Brand Name:Lange Model Number:lg 1078 Place of Origin:Hebei China Light Weight Light Steel Frame Homes , Quick Assemble 1) The dry construction method above the foundation has no wet operation, and the interior decoration is easy to be in place at one time. After galvanizing and coating, the profile has beautiful ... |
Dongguang Lange Equipped Housing Co., Ltd.
Hebei |
![]() |
Brand Name:Lange Model Number:lg 1078 Place of Origin:Hebei China Light Steel Frame Prefabricated Houses Quick Installation for bungalow 1) The dry construction method above the foundation has no wet operation, and the interior decoration is easy to be in place at one time. After galvanizing and coating, the profile has ... |
Dongguang Lange Equipped Housing Co., Ltd.
Hebei |
![]() |
Brand Name:Jiangsu Herbert steel structure Model Number:Q235 Place of Origin:Jiangsu ...Building Structure construction diameter gas station 1. steel space frame gas station 2. Q235 steel structure, high rigidity gas station 3. Large diameter gas station Steel structure grid structure is currently the domestic large sports venues, industrial plants, theaters, waiting car hall and other buildings commonly used roof form. The method... |
Herbert (Suzhou) International Trade Co., Ltd
|
![]() |
Brand Name:QHHK Model Number:steel framed structures Place of Origin:Shenyang .... Especially for the load-bearing members of some steel structure workshop buildings, it is necessary not only to strengthen the quality control in the field construction process but also to adopt a scientific and practical design scheme, to ensure the |
QHHK Steel Structure
|
![]() |
Brand Name:YDX Model Number:YDX-SD Place of Origin:QINGDAO,CHINA ...Introduction to Steel Structures Steel structures are building structures primarily made of steel, constructed through methods such as welding and bolting. They are widely used in industrial plants, high-rise buildings, bridges, towers, and more. The steel... |
Qingdao Yidongxiang Steel Structure Co., Ltd.
Shandong |
![]() |
Brand Name:DAXIAN Model Number:DX8651 Place of Origin:China Lateral Flame Spread On Building Products In Vertical Configuration Testing Machine Product Introduction: Fire testing according to ISO 5658-2 evaluates a material's ability to withstand a fire spreading along its surface. The method is used to ... |
DONGGUAN DAXIAN INSTRUMENT EQUIPMENT CO.,LTD
Guangdong |